Field software that works off-grid.
Project management, field operations and BIM-adjacent tooling for construction — offline-first, so the crew on a basement level with no signal still gets the job done.
If it needs signal, it doesn’t work on site.
The job site is where construction software earns its keep and where most of it quits — no connectivity, harsh light, gloved hands. We build field-first: daily logs, inspections, drawings and tasks all captured offline and synced the instant a signal returns, on rugged tablets with controls you can hit wearing gloves. The project stays one source of truth whether you are in the trailer or thirty floors up.
The sector, honestly.
Construction software fails in a specific place: the job site. No signal, gloved hands, bright sun, a tablet that has to survive a drop — tools designed for an office desk simply stop working where the work happens.
We build field-first construction tech that is offline by default: daily logs, inspections, drawings and tasks captured on site with no bars and synced the moment a connection returns. The project stays a single source of truth from the trailer to the top floor.
And because disputes in this industry are settled with records, everything we capture — photos, logs, inspections — is time-stamped and traceable, so a claim is backed by evidence rather than memory.
Systems for construction.
The platforms we ship most often for this sector — each scoped to a number the business actually cares about.
Field operations & daily logs
Site reports, photos, inspections and timesheets captured offline and synced automatically when back in range.
Project management
Schedules, tasks, RFIs and submittals that keep office and site working from one live plan.
Drawings & BIM-adjacent
Plan viewing, markups and model references usable on a tablet at the work face.
Safety & compliance
Inspections, permits and incident reporting with the trail an audit or claim will demand.
Equipment & resources
Asset, material and crew tracking so the right people and kit are where the schedule needs them.
Cost & progress tracking
Budget, change orders and progress measured against plan in real time.
Numbers, not slideware.
Every engagement is scoped to a measurable result. The kinds of outcomes we build construction systems to move — and hold ourselves to.
The hard parts, handled.
The principles we build by in this sector — and what each one means once the system is live.
Offline is the default
Everything works with zero bars and reconciles on reconnect — the basement level is the design target, not the edge case.
Built for gloves and glare
Big touch targets, high contrast and rugged-device support so the tool works in real site conditions.
One source of truth
Office and field write to the same live project, so nobody builds off a drawing that changed yesterday.
Evidence for claims
Photos, logs and inspections are time-stamped and traceable, so disputes are settled with records, not memory.
From startups to scale.
The kinds of teams across construction we partner with — each with different stakes, the same standard of craft.
Chosen for the problem.
Framework-agnostic, outcome-opinionated. A representative stack for construction — the mix bends to your problem, never the reverse.
One team. Zero hand-offs.
The CODT disciplines we most often combine to build for construction — same architecture, same engineers, no integration tax.
Questions, answered.
The things buyers in construction ask us most. Anything else — put it in a brief, a senior engineer replies within a business day.
Does it really work with no connectivity?
Yes — offline-first is the design default. Logs, inspections and markups are captured with zero signal and reconcile automatically when a connection returns.
Can it run on rugged site tablets?
We build for rugged devices with large touch targets and high contrast, so the tool works with gloves and in bright sun.
Do you integrate with BIM or drawing tools?
We deliver plan viewing, markups and BIM-adjacent model references usable on site, and integrate with the drawing systems you already use.
Will it hold up as evidence in a dispute?
Photos, daily logs and inspections are time-stamped and traceable, giving you a defensible record for claims and audits.
Can office and field stay in sync?
Both write to the same live project, so the office plan and the site reality never drift apart.
Got a site your software
can’t reach?
Tell us about your projects, your crews and your sites. A senior engineer replies within one business day with a feasibility read.
